Talk to an engineer, not a sales deck
Every site has unique electrical, structural, and commercial constraints. Email or call us with your facility's energy bills, load profile, or site list. A named project engineer will review your data, examine your single-line diagram, and give you a straightforward assessment of what solar and storage will deliver on your tariff.
We respect your engineering timeline. A named technical lead reviews your enquiry and responds within one business day.
Emergency O&M response teams operate under contract SLAs.
Open location on Google MapsWhat helps our team size your system accurately
You do not need an exhaustive tender document to start a conversation. Sending basic site data by email helps our engineers model preliminary numbers before our first call:
| If you are evaluating… | Helpful information to include in your email |
|---|---|
| C&I Solar or Hybrid | 12 months of utility electricity bills, current contract demand (kVA), and available roof/land. |
| Battery Storage (BESS) | Peak load surges, generator fuel bills, and required hours of emergency backup autonomy. |
| Data Centres | Redundancy level (N+1, 2N), IT load growth plan, and existing UPS/generator switchgear ratings. |
| Telecom Tower Portfolios | Number of sites in the cluster, daily grid hours per site, and current battery chemistries. |
| Existing Solar/BESS O&M | Commissioning date, inverter makes, installed capacity (kWp), and recent generation losses. |
Before you commit capital
Storage and solar do not pay back equally across every state tariff or operating schedule. If your facility's consumption pattern, roof structural integrity, or tariff slabs do not justify a commercial deployment, our team will state that plainly during the initial assessment.
Corporate headquarters and operations office
Our engineering, design, and operations leadership teams operate from Pune, Maharashtra.
Emergency O&M response teams operate under contract SLAs.
Near EON Free Zone & World Trade Center Pune.
Our three-step qualification process
We follow a transparent, low-friction inquiry process:
Step 1: Direct Routing (Within 4 Hours)
Your message is routed directly to the designated project director—not a general call centre.
Step 2: Data Audit (Within 24 Hours)
We analyze your billing data against local solar insolation curves and state open-access or captive discom regulations.
Step 3: Initial Technical Review
We schedule a focused technical discussion to present preliminary sizing options, single-line diagram interfaces, and indicative economic payback assumptions.
Prefer to review our documentation first?
If your team is in early research and not yet ready to share site data, review our verified project literature:
Download the Corporate Overview
A complete review of our company background, engineering standards, and five service lines.
Download Corporate Profile (PDF)Examine Our Flagship Field Record
Read how our group deployed LFP energy storage across 1,000 distributed sites to one installation standard.
Read 1,000-Site Case StudyExplore Sister Brand Storage Hardware
Review Zyntra's configurable LFP cells, modules, and containerised BESS manufactured in Pune.
Visit Zyntra Storage (External)