Integrated solar infrastructure

Solar EPC for industry, utilities and rooftops

Terragreen designs, procures, builds and commissions solar power plants for commercial, industrial and utility generation. We apply one engineering standard across every format, from a 500 kW factory rooftop to a 50 MW grid-connected plant, with electrical interfaces and storage options planned from day one.

A Terrakraft India company. Standalone and hybrid systems engineered to documented baselines. Storage options delivered with Zyntra on technical merit.

Rooftop solar array on an industrial building Industrial rooftop
Ground-mounted solar plant at sunset Ground-mounted C&I
Utility-scale solar plant with a pooling substation Utility-scale
Utility-scale solar plant with a pooling substation
Solar EPC

Energy that stays on.

We apply one engineering standard across every format, from a 500 kW factory rooftop to a 50 MW grid-connected plant.

Storage-first integration

Solar designed with storage compatibility in mind

Solar generation follows solar irradiance. Your facility's operating load follows production schedules, machine startups, and contracted delivery deadlines.

When a standard solar plant generates power, any grid drop or sudden cloud cover can drop your bus voltage or trip sensitive drives. If you plan to add battery storage now or in three years, the electrical architecture must account for it today.

If your plant experiences grid instability, peak-demand surcharges, or evening loads, review our hybrid solar and storage systems or standalone battery storage (BESS).

Rooftop solar and container storage on a data-centre campus
Illustrative image: rooftop solar and container storage on a data-centre campus.
1

DC and AC coupling provisions

Inverter configurations selected to accommodate battery storage without rewiring existing arrays.

2

Switchgear and bus planning

Adequate breaker space, rated busbars, and protection relays designed to integrate bi-directional power flows.

3

Energy management integration

Monitoring systems that track generation against plant load profiles in 15-minute intervals.

Scope and delivery boundaries

What Terragreen delivers under a solar EPC contract

We do not use the term “turnkey” unless the contract covers the full delivery chain. Every proposal clearly delineates our responsibilities, your site responsibilities, and third-party scopes.

Project stageResponsibilityDetailed scope delivered
Engineering & DesignIncludedTopographical/roof survey, generation modeling (PVSyst), single-line diagrams, civil foundation engineering, and protection design.
ProcurementIncludedTier-1 solar modules, string/central inverters, module mounting structures (MMS), HT/LT switchgear, cabling, and transformers. Equipment schedule lists every manufacturer.
Civil & Electrical ConstructionIncludedFoundation piling/ballasting, module assembly, DC/AC cabling, earthing pits, lightning protection, and control room construction.
Interconnection & LiaisonIncludedCEIG approvals, discom grid synchronization, net-metering/open-access documentation, and bay construction up to the point of common coupling.
Testing & CommissioningIncludedPre-commissioning cold/hot testing, insulation resistance, string VOC/ISC checks, inverter calibration, and formal performance ratio (PR) testing against stated criteria.
Controls & EMSIncludedSCADA, weather monitoring stations (WMS), and cloud-based string-level telemetry.
Ongoing O&MOptionalPreventive maintenance, array thermography, module cleaning schedules, and guaranteed response times under a separate Solar O&M Agreement.
How we start

The assessment process

We do not present speculative estimates. Every proposal rests on verified site data and stated baseline tariffs.

1

Step 1: Data gathering

12 months of utility bills and 15-min load profile.

2

Step 2: Technical assessment

Solar irradiance modeling and preliminary sizing.

3

Step 3: Engineering review

SLD review, structural checks, and commercial payback model.

What you provide

Your last 12 months of electricity bills, peak demand data, and available roof or land drawings.

What you receive

A modeled system layout, expected generation yield (kWh/kWp), detailed equipment schedule, and an itemized financial payback model with all assumptions disclosed.

1,000
sites. One installation standard.

Delivered by Zyntra, per its proposal of October 2026.

Read the case study
Questions

Frequently asked questions about our solar EPC services

Does Terragreen execute projects as a direct contractor or through sub-contractors?

Terragreen is the single accountable EPC contractor. Our in-house engineering team designs the plant, our project directors oversee site execution, and our safety officers manage site compliance through commissioning.

Can we add battery storage to a Terragreen solar plant later?

Yes. We document the electrical interface, space layout, and switchgear capacity during initial design so a battery energy storage system can be integrated without retrofitting major civil or busbar infrastructure.

Which equipment brands does Terragreen use?

Equipment is selected on technical and commercial merit to match project specifications. Every proposal includes an equipment schedule identifying module, inverter, and balance-of-system manufacturers. Where battery storage is specified, Zyntra storage products are evaluated alongside industry alternatives and any group relationship is disclosed.

Review solar generation potential for your site

Share your facility's location and annual energy consumption. Our engineering team will prepare an initial yield and economic assessment.